Centres set their own paperwork requirements before an activation can move in. They may ask for a booking form, proof of insurance, a picture or plan of the display, a bump-in time, and details of anyone building it. Food, chemicals and prize draws can add further approvals.
Here's what centres ask for, who usually supplies each item, and how early to send it. The examples come from casual leasing and contractor guides that centres publish on their own websites. Some are several years old, and every centre sets its own terms, so ask your centre for its current pack. For the display rules themselves (height, signage, cabling), see our shopping centre display rules.
Centres approve a booking before they confirm it, and the form is where that starts. Mount Sheridan Plaza in Queensland wants its agreement submitted "for approval no less than 5 business days before the booking date", and its form asks you to "Describe the display" and whether you need power.
If you're an agency, say so. The same form asks, "If you are an agency booking on behalf of a client, name them here".
Who supplies it: whoever holds the booking, brand or agency.
Harbour Town Gold Coast, Mount Sheridan Plaza, Dalby Shoppingworld, Victoria Point and Cannon Hill Kmart Plaza all ask for public liability cover of at least $20 million. The detail that trips people up is the wording on the certificate:
Who supplies it: the business named on the booking, through its broker. If an agency books but the brand's policy is used, sort out the names before you submit.
Convention and exhibition centres ask for the same certificate, with their own timing. Brisbane Convention & Exhibition Centre's own exhibitor guide wants public liability cover running from the first bump-in day through the last bump-out day, and sets separate deadlines for food/drink suppliers (at least 7 days before bump-in) and for any alcohol sampling (at least 35 days before bump-in, alongside a current RSA certificate and liquor licence).
Centres want to see what's going on the floor. The display guidelines published by Cannon Hill Kmart Plaza ask for photos "and/or a plan of proposed kiosk/layout including dimensions and description of all products". Victoria Point asks for "Photographs of proposed display equipment".
A good pack has:
Check banner rules at the same time. Many Westfield centres no longer allow pull-up banners, so ask before you include one. Where banners are allowed, ours for shopping centres are 1.5m high and double-sided.
Who supplies it: your brand or agency, using display dimensions from your supplier and your own artwork and product list.
Many centres specify out-of-hours bump-in windows. Lendlease's Macarthur Square pop-up pack lists bump-in and bump-out times before trade (6.30am to 8am) and after trade (7pm to 11pm, or after 9pm on Thursdays), and asks you to "coordinate after hours access with Security and sign-in prior to bumping in and out". Victoria Point wants displays installed "no later than 8.00am" (9am on Sundays).
Your plan should give the date and time, the vehicle and loading dock, who's on site, and how long the build takes. Harbour Town's contractor rules say materials must not be moved through public areas during trading hours, and shopping trolleys must not be used to move goods.
If a contractor builds or installs your display, the centre may treat it as contractor work. Harbour Town's rules for contractors list the documents contractors provide: safe work method statements (SWMS), public liability of at least $20 million, a "Workers Compensation Certificate of Currency", and a full site induction for everyone "prior to working on site".
The law requires a SWMS (safe work method statement) for certain high-risk construction work. Centres may separately ask for a SWMS or risk assessment for other installations. Harbour Town asks for a site-specific SWMS for its own listed high-risk activities, including using a scissor lift or cherry picker. Ask your centre which document it wants for this job.
Who supplies it: the installer, for their own team. When we install a custom build for you, we work with you to supply it.
Ask about power when you book. Cannon Hill Kmart Plaza says power is available at most sites, and asks you to tell the centre "if power is required at time of booking". Check your centre's testing and tagging requirements for electrical equipment; Mount Sheridan Plaza sets these out in its own terms. The display rules guide linked above covers cabling, trip hazards and RCDs.
Who supplies it: whoever owns the equipment, with testing records where the centre asks for them.
Some activations need extra approvals, from the centre or from outside it:
Who supplies it: the brand, or the agency running the promotion.
Aim to send one complete pack at least two weeks before bump-in, and confirm your centre's actual deadlines. Two weeks covers the longest deadline in the examples above, not every centre's rules. Then check:
Find the right centre contact in our shopping centre managers directory. Our team knows the major centres' compliance rules. We can help prepare what the centre needs to approve your display, then handle the installation and pack-down as part of our project management. Call us on 1300 240 250 with the centre, the dates and the site size.