The easiest way to plan a brand activation is to start from the live date and work backwards. Three dates matter most: about 12 weeks out, when the site and the brief should be locked in; 6 weeks out, when a custom build needs to go into production; and 1 week out, when everything should be ready to load.
Why 12 weeks? A custom brand activation build typically takes us about 5 weeks. Before that, the concept has to be designed and approved by your team and by the venue or centre. After it, the kit has to be checked, packed and delivered. Twelve weeks leaves room for all of that without a rush. A simpler activation using catalogue kit can be done in less: our custom portable displays, for example, have a standard production time of 1.5 weeks once the order is placed and the artwork is print-ready.
Every venue and centre sets its own deadlines, so treat the timeline below as a planning guide and confirm the real dates with them. For a casual mall kiosk, our pop-up shop planning guide has a shorter timeline, and for trade shows, see how far in advance to plan for an exhibition.
This is the planning stage. Decisions made now set the budget, the design and every deadline that follows.
Tell us your live date and site, or call 1300 240 250, and we'll map the production schedule back from there.